Factory to Home in 5 Steps
Precision Manufacturing • Quality Control • Swift Installation

The Future of Building,
Perfected in 5 Steps

Step 1 of 5

Initial Consultation & Vision

Understanding your unique requirements

We begin with a comprehensive consultation to understand your vision, budget, and timeline. Our experts analyze your site through virtual surveys and 3D scans, creating a feasibility study that outlines the perfect prefab solution.

24-48h response time

Digital site analysis

Preliminary cost estimate

🌿

Digital-first approach saves 85% of traditional consultation emissions

Virtual Consultation

💻

Interactive site analysis

Feasibility Study

📊

Project roadmap preview

Step 2 of 5

Precision Design & Planning

Engineering your prefab solution

Our architects and engineers collaborate to create optimized designs using BIM technology. We develop detailed 3D models and virtual walkthroughs, ensuring every panel is precision-engineered for your specific requirements.

BIM 360° modeling

Virtual reality previews

Seismic optimization

🌿

Digital prototyping reduces material waste by 30%

3D Design Preview

BIM 360° Modeling & Virtual Reality Preview

Step 3 of 5

Factory Production & Panel Assembly

Climate-controlled precision manufacturing

Your building components are manufactured in our state-of-the-art facilities. Expert craftsmen using precision machinery ensure millimeter-perfect accuracy while quality control teams verify every component before shipping.

0.5mm tolerance standards

Handcrafted precision

7-stage quality control

🌿

Factory efficiency reduces energy use by 40% vs on-site

Factory Floor View

🏭

Expert precision manufacturing line

Precision Cutting

Expert Assembly

Quality Check

Step 4 of 5

Groundwork & Swift Installation

Rapid on-site assembly

Prepared foundations meet our precision components. Certified installation teams assemble structures in record time, with typical homes completed in 3-5 days using our panelized system.

3-5 day assembly

Certified installation teams

Weather-protected process

🌿

80% faster build time reduces neighborhood disruption

Installation Timeline

1
Day 1
2
Day 2
3
Day 3
4
Day 4
5
Day 5

Time-lapse Installation Preview

Step 5 of 5

Final Touches & Project Handover

Quality assurance and client orientation

We conduct rigorous final inspections and performance testing. Your project manager guides you through every system before handing over the keys and comprehensive warranty documentation.

300-point inspection

Performance testing

10-year structural warranty

🌿

Comprehensive testing ensures 30-year+ building lifespan

Quality Assurance

Structural Inspection

  • Panel integrity
  • Seismic resistance
  • Load testing

Systems Check

  • Electrical
  • Plumbing
  • HVAC
  • Insulation
🔑

Comprehensive handover with 10-year warranty

Why Our Process Wins

Comparing traditional construction with Starland's prefab advantage

TTraditional Construction

  • 6-12 month project timelines
  • Weather-dependent schedules
  • 30% material waste on site
  • Inconsistent quality control
  • High neighborhood disruption
  • Limited design flexibility

SStarland Prefab Process

  • 2-4 month project completion
  • Weather-independent factory production
  • <5% material waste
  • Millimeter precision quality
  • Minimal site disruption
  • Complete design flexibility
80%

Faster project completion

85%

Less construction waste

60%

Reduced CO2 emissions